Modular Project

Pre-treatment Unit Project

Scope of Supply (EPF)

  • Engineering : Plot Plan, 3D model development, Piping, Structure, Thermal Design (Heat Exchangers), Mechanical Design
  • Procurement : Piping material, Structure Material, Instrumentation, Vessel Material
  • Fabrication : Piping, Structure, Pressure Vessels, Skid mounting and Modularization
  • Summary of Equipment : 7 modularized skids、 7 Pressure Vessels
Back