Mar 2018 ~ May 2019
RC (reinforced cement) Factory building (including elevator, indoor water / electrical supply, indoor fire-fighting system, lighting, electrical socket and so on) constructions and its foundation connected with the piles which were done by other contractor
Construction of steel structural warehouse for Ocean Shipping
Construction of steel structural warehouse for Ocean Pollutants
Security guard room and the shelter construction including seals for truck loadings
Newly constructed gate and its fence
Prepare the soil of plant site for all kinds of buildings
Contractor should apply for all kinds of government or administration organizations licenses and fire-fighting, drinking water, electricals, telecommunications and so on permits for all buildings, equipment and foundations etc. Before commissioning, it is required to have all kinds of licenses or permits documents according to regulations of government and the contracts.
2017年4月 ~ 2017年5月
以Pro.2軟件及銘榮元自身研發之模組程式計算最優化之節能設計和規劃。
依設計,於對流區增加爐管管排以及於製程段增設爐管。
改善效益符合需求,節省燃氣量5%及降低煙氣出口溫度19°C。
完善的施工計畫得以讓建造團隊能配合工安管理,安全的執行工地拆裝作業。
品質管制計畫,依設計要求,於施工中、完成時執行檢測(PT、RT、PWHT等)。 並於完工前執行水壓試驗及爐內外密封檢查,以落實效益要求。