330 T/D Air Separation Unit EPC Project

May 2012 ~ Feb 2014

  1. Check and modify the civil work drawings, including 3 buildings (office, machine room and electric room, 1200 M2), steel structure, equipment foundations 35 sets and all the construction of work.
  2. Piping design, procurement, fabrication and installation, including carbon and stainless steel pipe: 22,000 DB (Dia-inch)
  3. Except the P&ID, all detail drawings of piping, instrument /control and electric, procurement, fabrication, installation and assistance for commissioning are provided by MRY.
  4. The main erection of equipment includes: hot box, compressor, booster, cold box, turbine, air filter, evaporator, charging pump, expansion equipment, circulating filter, HP liquid Oxygen pump, fire pump, various pumps for producing Oxygen, Nitrogen and Argon.

SM3 HS-201.219加熱爐節能改善工程

2017年4月 ~ 2017年5月

1.

以Pro.2軟件及銘榮元自身研發之模組程式計算最優化之節能設計和規劃。

2.

依設計,於對流區增加爐管管排以及於製程段增設爐管。

3.

改善效益符合需求,節省燃氣量5%及降低煙氣出口溫度19°C。

4.

完善的施工計畫得以讓建造團隊能配合工安管理,安全的執行工地拆裝作業。

5.

品質管制計畫,依設計要求,於施工中、完成時執行檢測(PT、RT、PWHT等)。 並於完工前執行水壓試驗及爐內外密封檢查,以落實效益要求。

銘榮元實業股份有限公司

屏東縣新園鄉媽祖路418號

+886 8-869-1899

+886 8-869-2090

mry@mry.com.tw

Ming Rong Yuan Business Co., Ltd.

No.418, Matzu Rd., Shinyuan County, Pingtung, Taiwan 932

+886 8-869-1899

+886 8-869-2090

mry@mry.com.tw

元上工程股份有限公司

高雄市前金區五福三路80號13樓

+886 7-272-9168

+886 7-272-9179

mry@mry.com.tw

Yuan Shang Engineering Co., Ltd.

13F., No.80 , Wufu 3rd Rd., Kaohsiung, Taiwan 801

+886 7-272-9168

+886 7-272-9179

mry@mry.com.tw

銘榮元